EV. EV-TNL-25076
Anunci de licitacióContracte de serveis per a la redacció de l’estudi de viabilitat d'un tramvia entre Andorra i la Seu d'Urgell. Clau: EV-TNL-25076
Party
Infraestructures de la Generalitat de Catalunya, SAU
Documents
8 total, 7 extracted
Requirements
2 roles, 9 conditions
Budget
€716,898
Deadline Jul 20, 2026, 11:00 AM
Award Criteria
Price offer
Objective price · formula
Formula
Variables
evidence
page 91
Oferta econòmica [0-35] PEi = 35 * ( 1 - (Oi – Omin) / IL )
Technical team experience in similar works
Objective technical · formula
Formula
weighted average of individual profile scores using role weights 60% author and 40% technician
Variables
evidence
page 91
1.2 Experiència dels perfils tècnics de l’Equip redactor [0-34]
page 5
Autor del Projecte o de l’Estudi: 60 % Tècnic 1: 40 %
Similar work accumulated amount thresholds
Objective technical · formula
Formula
points by INCR relative to IREF
Variables
| points | Conditions |
|---|---|
| 0 | INCR < 0.1*IREF |
| 4 | 0.1*IREF <= INCR < 0.5*IREF |
| 8 | 0.5*IREF <= INCR < IREF |
| 12 | IREF <= INCR < 1.5*IREF |
| 16 | 1.5*IREF <= INCR < 2*IREF |
| 19 | 2*IREF <= INCR < 2.5*IREF |
| 22 | 2.5*IREF <= INCR < 3*IREF |
| 25 | 3*IREF <= INCR < 3.5*IREF |
| 27 | 3.5*IREF <= INCR < 4*IREF |
| 29 | 4*IREF <= INCR < 4.5*IREF |
| 31 | 4.5*IREF <= INCR < 5*IREF |
| 33 | 5*IREF <= INCR |
evidence
page 92
La puntuació associada al valor INCR obtingut, és la següent: INCR < 0,1*IREF 0 ... 5*IREF <= INCR 33
BIM methodology
Objective technical · points
evidence
page 5
Metodologia BIM. [0-6] 1. Metodologia BIM [0-6] punts
Objective additional improvements
Objective technical · formula
Formula
capped total for additional drafting team, infographic products and other presentations
Variables
evidence
page 5
Millores addicionals subjectes a criteris de valoració objectiva. [0-1] 1. Increment d’Equip redactor [0-0,5] punts 2. Productes infogràfics [0-1] punts 3. Altres presentacions del projecte o estudi [0-0,5] punts
Subjective technical proposal
Subjective technical · formula
Formula
organization proposal 5 + procedure report 16 + additional studies 3
Variables
evidence
page 5
B. Proposta tècnica amb valoració subjecta a judici de valor: [0-24] punts
Organization proposal
Subjective technical · thresholds
| points | Conditions |
|---|---|
| 4 | Complete organization chart including all generic areas and detailed functions |
| 1 | One or more additional specific-interest areas with detailed functions |
evidence
page 96
Presentació d’un organigrama complet que inclou totes les àrees genèriques amb descripció detallada de les funcions de cadascuna. [4] S’incorpora una o més àrees addicionals d’interès específic amb descripció detallada de les funcions de cadascuna. +1
Procedure report
Subjective technical · formula
Formula
contract-object analysis 6 + work programme 5 + quality assurance plan 5
Variables
evidence
page 94
2.2 Memòria de procediment [0-16] Anàlisi de l’objecte del contracte redactar: 0-6 ... Programa de treball: 0-5
Additional studies
Subjective technical · formula
Formula
1 point per valid additional study up to 3
| points | Conditions |
|---|---|
| 3 | >= 3 valid additional studies |
| 2 | 2 valid additional studies |
| 1 | 1 valid additional study |
| 0 | 0 valid additional studies |
evidence
page 97
El nombre d’estudis considerats d’interès per l’objecte del contracte amb valor afegit al mateix és superior o igual a 3. 3
Score Simulation
Enter our offer to compute objective points. Add the lowest rival offer to fix the price score.
Role coverage canvas
Required
Autor del Projecte o de l‘Estudi (també anomenat en Plec “Tècnic principal”)
Experience
15 years
Dedication
30%
Seniority
15 years of experience
Core requirements
Degree
pendingUniversity degree accrediting adequate professional and technical capacity for the contract object
domain skill
pendingCivil works
minimum experience years
pending>= 15 years
Dedication percent
pending>= 30%
Similar works type
pendingRoute studies and/or railway/tramway action projects
similar work budget eur
pending>= €480,000
compatibility constraint
pending<= 100%
professional license
pendingProfessional association habilitation/accreditation must be provided when requested
Required
Tècnic 1: Responsable àrea Estudi de demanda
Experience
15 years
Dedication
20%
Seniority
15 years of experience
Core requirements
Degree
pendingUniversity degree accrediting adequate professional and technical capacity for the contract object
domain skill
pendingCivil works
minimum experience years
pending>= 15 years
Dedication percent
pending>= 20%
Similar works type
pendingRailway/tramway demand studies
similar work budget eur
pending>= €25,000
professional license
pendingProfessional association habilitation/accreditation must be provided when requested
Conditions
requirements company
5professional_indemnity_insurance
>= 150000professional_indemnity_insurance...
professional_indemnity_insurance
definitive_guarantee
= 5 5% of award price, VAT excluded5% of award price, VAT excluded...
5% of award price, VAT excluded
deuc_declaration
provided Signed DEUC declaration by bidder; UTE and third-party solvency entities must provide their own DEUC where applicableSigned DEUC declaration by bidder; UTE and third-party solvency entities must provide their own DEUC where applicable...
Signed DEUC declaration by bidder; UTE and third-party solvency entities must provide their own DEUC where applicable
sectorial_agreement_compliance
provided Bidder must accredit compliance with applicable sectorial and territorial collective agreement for own and subcontracted personnelBidder must accredit compliance with applicable sectorial and territorial collective agreement for own and subcontracted personnel...
Bidder must accredit compliance with applicable sectorial and territorial collective agreement for own and subcontracted personnel
ute_documentation
provided_if_applicable If awarded to a UTE, the temporary union must provide public deed of constitution, sole representative/power of attorney, and assigned tax IDIf awarded to a UTE, the temporary union must provide public deed of constitution, sole representative/power of attorney, and assigned tax ID...
If awarded to a UTE, the temporary union must provide public deed of constitution, sole representative/power of attorney, and assigned tax ID
special execution condition
3sectorial and territorial collective agreement compliance
The contractor and subcontractors must comply with the applicable sectorial and territorial agreementThe contractor and subcontractors must comply with the applicable sectorial and territorial agreement...
The contractor and subcontractors must comply with the applicable sectorial and territorial agreement
ethical principles and conduct rules compliance
The contractor must comply with ethical principles and conduct rules under clause 15The contractor must comply with ethical principles and conduct rules under clause 15...
The contractor must comply with ethical principles and conduct rules under clause 15
subcontractor payment information obligation
30 Applies if subcontracting amount is equal to or greater than 30 percent of contract priceApplies if subcontracting amount is equal to or greater than 30 percent of contract price...
Applies if subcontracting amount is equal to or greater than 30 percent of contract price
staffing execution condition
1replacement of assigned technical staff
Replacement technical staff must meet the required technical/professional solvency and maintain the valued experience profile or keep the offer best rankedReplacement technical staff must meet the required technical/professional solvency and maintain the valued experience profile or keep the offer best ranked...
Replacement technical staff must meet the required technical/professional solvency and maintain the valued experience profile or keep the offer best ranked
Assistant Workflow
Structured YAML draft
Export roles, criteria, conditions, candidate slots, and proposal package placeholders.
Download YAMLDownload tender documents
8/8 documents downloaded
Extract structured YAML draft
2 roles, 15 role requirements, 5 company requirements, 9 award criteria, 4 conditions
Review, refine, and re-ask
Edit the YAML draft and sync it back when validated.
Sync validated YAML into database
Database structured requirements are the source for CVS import.
Ingest into CVS
Use the CVS import payload once roles and conditions are validated.
Propose candidates per role
Next integration point: rank CVS employees against requirement_items.
Generate internal committee proposal deck
Next integration point: create PPT from tender summary, roles, gaps, and proposed team.
Document Search
Documents
Additional
Additional
unsupported document type without docling: application/msword (Annexos plec format word.doc)
Additional
Additional
CVS Import Payload
2
Roles
9
Conditions
8
Docs
Metadata
- Source
- pscp_catalunya
- UUID
- b32722ce-6f95-44dc-86c0-f0a2e05521ca
- CPV
- 71311000-1
- Published
- Jul 2, 2026, 2:26 AM